Monday, March 1, 2010

Carpet

Sunday, Feb. 28: Carpet was laid in all the rooms. We held off on the stairs since it is well-traveled due to all the tools and supplies being downstairs. It will be laid closer to the end of construction.
Livingroom (a frieze carpet):Ben & Sebastian's bedroom:Our bedroom (I finally feel like I can stop calling it "the master bedroom"!)Playroom (it is a soft berber):Base cabinet was put in the master bathroom but is not installed. Our bathroom needs tile on the floor and in the shower, the toilet installed, and the base cabinet and onyx top set.Chris installed the eyeball lights in the livingroom and finished the wood floor (minus the closet) in Max's bedroom. He also finished installing the under-cabinet lighting.
Recessed lighting in the livingroom (the center is a spot for a fixture that we are just going to cap off and pick out a fixture later---I need more time!)Max standing on his finished floor: (Picture taken from the guest bedroom; Ben is peeking out of the bathroom doorway)
Monday, March 1: Jesse came over and he and Chris worked to get ready for the electrical inspection which is Wednesday....installing outlets, fans, switches, fixtures, and making sure everything works.
Here's the light fixture in the entryway.Here are the pendants above the kitchen counter. Today, I installed floor registers and wall vent covers. Chris installed the kitchen sink, drains, and garbage disposal. He's still working on the plumbing for it.
(Yes in this one, he's talking on the phone too)
And, we got another load of rock for our sloppy muddy drive and Chris spread it out.