Thursday, Jan. 14: Chris and Dad hung the door to the garage, finished the back porch ceiling, did some backing & miscellaneous framing (like built-ins)....and just finished up things to prepare for the inspections and drywall.
Wednesday, January 13, 2010
Electrical inspection
Wednesday, Jan. 13: Jesse came and worked on more electrical this morning. The inspector came and we passed the electrical inspection.
Thursday, Jan. 14: Chris and Dad hung the door to the garage, finished the back porch ceiling, did some backing & miscellaneous framing (like built-ins)....and just finished up things to prepare for the inspections and drywall.

Friday, Jan. 15: The plumbing inspection, framing inspection, and HVAC inspection will be today at 10:30 am.
Thursday, Jan. 14: Chris and Dad hung the door to the garage, finished the back porch ceiling, did some backing & miscellaneous framing (like built-ins)....and just finished up things to prepare for the inspections and drywall.