By the end of the day Wed, Oct. 7th, these windows were installed (back of the house):

East side:

Installing the downstairs bedroom window:

Front of the house:

Garage windows:

They put up the Tyvek again on the west side of the house.

Only these two windows on the west side (a bedroom and laundry room) and the kitchen window are left to install.