Tuesday, August 25, 2009
Prepping for the second pour
The plumbing was inspected Monday so then the area was prepped so we can pour another part of the basement floor tonight (Tues.) Here are the stairs formed for the two steps down into the family room.
Then the pipes had to be covered and the dirt leveled out.


We have twenty acres for the boys to play on, but the only place they want to be is right here!! working with the guys to help build our new house. :)
Concrete is supposed to be on site at 4:30 today (Tues, August 25th.)