Steel beams were set today. On the left is our basement family room (that will be two steps lower than the rest of the basement), in the middle will be a storage room, and on the right will be two bedrooms and a bathroom.
Newer Post
Older Post
Home
Blog Archive
►
2013
(4)
►
January
(4)
►
2012
(3)
►
November
(1)
►
October
(2)
►
2011
(15)
►
November
(1)
►
October
(1)
►
September
(2)
►
August
(2)
►
July
(1)
►
May
(3)
►
April
(2)
►
February
(1)
►
January
(2)
►
2010
(56)
►
November
(2)
►
October
(2)
►
September
(3)
►
August
(2)
►
July
(1)
►
June
(1)
►
May
(2)
►
April
(4)
►
March
(11)
►
February
(19)
►
January
(9)
▼
2009
(101)
►
December
(17)
►
November
(9)
►
October
(23)
►
September
(31)
▼
August
(14)
The Basement Floor, Part 3
The Basement Floor, Part 2
Prepping for the second pour
Beams
Plumbing
The Basement Floor
Getting ready to pour the floor
Walls
Power
We have an address!
Visitors
Setting Forms
Footings
OPPD
►
July
(7)
►
2008
(2)
►
April
(1)
►
January
(1)