Saturday, August 22, 2009

Beams

Steel beams were set today. On the left is our basement family room (that will be two steps lower than the rest of the basement), in the middle will be a storage room, and on the right will be two bedrooms and a bathroom.
Posted by chrisandannel at 2:47 PM
Newer Post Older Post Home

Blog Archive

  • ►  2013 (4)
    • ►  January (4)
  • ►  2012 (3)
    • ►  November (1)
    • ►  October (2)
  • ►  2011 (15)
    • ►  November (1)
    • ►  October (1)
    • ►  September (2)
    • ►  August (2)
    • ►  July (1)
    • ►  May (3)
    • ►  April (2)
    • ►  February (1)
    • ►  January (2)
  • ►  2010 (56)
    • ►  November (2)
    • ►  October (2)
    • ►  September (3)
    • ►  August (2)
    • ►  July (1)
    • ►  June (1)
    • ►  May (2)
    • ►  April (4)
    • ►  March (11)
    • ►  February (19)
    • ►  January (9)
  • ▼  2009 (101)
    • ►  December (17)
    • ►  November (9)
    • ►  October (23)
    • ►  September (31)
    • ▼  August (14)
      • The Basement Floor, Part 3
      • The Basement Floor, Part 2
      • Prepping for the second pour
      • Beams
      • Plumbing
      • The Basement Floor
      • Getting ready to pour the floor
      • Walls
      • Power
      • We have an address!
      • Visitors
      • Setting Forms
      • Footings
      • OPPD
    • ►  July (7)
  • ►  2008 (2)
    • ►  April (1)
    • ►  January (1)