The buildings

Garage doors installed on metal building.  
Also electrical work (lights, outlets) being done inside.
Liner panel finished.
Shop: Garage doors installed. 
Wall on west side put up (Tyvek. Metal coming.) 
Today, Jan. 9, windows are being installed.


Posted by chrisandannel at 9:15 AM
Newer Post Older Post Home

Blog Archive

  • ▼  2013 (4)
    • ▼  January (4)
      • Chris's office inside the shop
      • Windows installed at the shop
      • The buildings
      • Inside the metal building
  • ►  2012 (3)
    • ►  November (1)
    • ►  October (2)
  • ►  2011 (15)
    • ►  November (1)
    • ►  October (1)
    • ►  September (2)
    • ►  August (2)
    • ►  July (1)
    • ►  May (3)
    • ►  April (2)
    • ►  February (1)
    • ►  January (2)
  • ►  2010 (56)
    • ►  November (2)
    • ►  October (2)
    • ►  September (3)
    • ►  August (2)
    • ►  July (1)
    • ►  June (1)
    • ►  May (2)
    • ►  April (4)
    • ►  March (11)
    • ►  February (19)
    • ►  January (9)
  • ►  2009 (101)
    • ►  December (17)
    • ►  November (9)
    • ►  October (23)
    • ►  September (31)
    • ►  August (14)
    • ►  July (7)
  • ►  2008 (2)
    • ►  April (1)
    • ►  January (1)