The Shop, concrete tilt-up building

 Circle drive poured.
Wed, Oct. 24th, 2012: Wall panels picked up.





























Metal storage building
Outside of concrete building
From road

Inside of metal building
Posted by chrisandannel at 12:55 PM
Newer Post Older Post Home

Blog Archive

  • ►  2013 (4)
    • ►  January (4)
  • ▼  2012 (3)
    • ►  November (1)
    • ▼  October (2)
      • The Pond area
      • The Shop, concrete tilt-up building
  • ►  2011 (15)
    • ►  November (1)
    • ►  October (1)
    • ►  September (2)
    • ►  August (2)
    • ►  July (1)
    • ►  May (3)
    • ►  April (2)
    • ►  February (1)
    • ►  January (2)
  • ►  2010 (56)
    • ►  November (2)
    • ►  October (2)
    • ►  September (3)
    • ►  August (2)
    • ►  July (1)
    • ►  June (1)
    • ►  May (2)
    • ►  April (4)
    • ►  March (11)
    • ►  February (19)
    • ►  January (9)
  • ►  2009 (101)
    • ►  December (17)
    • ►  November (9)
    • ►  October (23)
    • ►  September (31)
    • ►  August (14)
    • ►  July (7)
  • ►  2008 (2)
    • ►  April (1)
    • ►  January (1)