These are the parts of the floor that are poured.
Saturday, August 22, 2009
Plumbing
Thursday the 20th and Friday the 21st, plumbing was completed. That's Chris Otte (a plumber and our neighbor from across the road), Dad, and Chris working with Ben supervising. :) The plumbing will be inspected Monday then we will be able to pour the rest of the floor. (didn't get done in time to pour today, Saturday, as planned.)


These are the parts of the floor that are poured.

These are the parts of the floor that are poured.